Solar Panel Crane Lift at the Flats Phase 3
October 19, 2020News
DiSabatino Construction, Active Crane, and KC Green Energy successfully completed a crane lift of the new solar panels on top of Building 17 at the Flats Redevelopment, Phase 3.
Make sure to watch in HD by clicking on the gear icon in the bottom right.